Upgrading to Bitumen Standards of Selected Link Roads and Construction of 2 No. Footbridges within Meru Town
Mambo muhimu
Shirika
Kenya National Highways Authority (KeNHA)
Nchi
Kenya
Imechapishwa
23 Novemba 2026
Muhtasari
The Kenya National Highways Authority has put out a tender for works in Meru Town with two named components: bringing chosen link roads up to a bitumen standard, and building two footbridges. The record is tagged to the construction and transport sectors, which fits that reading of the title. That is the whole of what is published here. Nothing states how many link roads are involved, their length or location, what the footbridges will cross, whether design or supervision duties fall to the contractor, how long the contract runs, or what it is expected to cost. There is no budget figure, no prequalification criteria, no list of documents a bid must contain and no evaluation method. A contractor weighing whether this is worth pursuing would need the full tender document, because the fields given describe the subject of the works only in general terms and do not set out what a winning bidder would be obligated to deliver beyond those two headline items.